The Henrico Waste Water Treatment project was a four phase renovation of the existing HVAC system. The new system included (2) two air cooled chillers, (4) four Air Handling Units, (39) chilled beams, (2) two heat exchangers, (6) six base mounted pumps, (23) terminal boxes, (15) exhaust fans, (6) precision air valves, and associated duct and piping systems. The lab space is served by the chilled beam system and the offices have their own terminal boxes.
Owner

Project Size

Architect


Engineer
Henrico County

47,450 sq. ft.

Hazen and Sawyer

Dunlap & Partners