HEALTHCARE

  • HCA Hanover Emergency Center

    The HCA Hanover Emergency Center project was a new ground up free standing emergency department. Our scope of work consisted of HVAC, plumbing, and medical gas systems serving the facility's exam rooms, triage, and imaging department. The HVAC consisted of two packaged roof top units totaling 90 tons. The rooftop units served 45 VAV boxes and associated ductwork.





  • EDUCATION

    • Our Lady of Lourdes School Renovation

      The Our Lady of Lourdes Renovation project consisted of a new HVAC system installation that was completed in 56 days over summer break. The HVAC system included 13 wall mounted packaged air conditioning units, associated natural gas piping, and ductwork serving the classrooms. The administration offices were served by multi-zone heat pumps.

    • St. Edward-Ephiphany School Renovation

      The St. Edward-Epiphany School project was a design-build renovation of the HVAC system serving the school. Our scope of work consisted of a new VRF system, new outdoor air units, and substantial upgrades to the existing heating hot water system. The project which included 4,000 ft. of refrigerant pipe, and 1,500 ft. of heating water piping was completed in 45 working days.





COMMERCIAL + OFFICE

  • HOPE Church Kids & Lodge

    The HOPE Church Lodge building serves as a standalone youth ministry located on the western side of the West Creek Campus. The HOPE Kids building is an addition and renovation of the existing childrens ministry. The HVAC scope of work consisted of two packaged Roof Top Units serving the Hope Kids building, and a VRF system coupled with a dedicated outdoor air unit serving the HOPE Lodge.

  • Richmond ARC

    ARCenter serves as the headquarters for the Greater Richmond ARC. Our scope of work consisted of Natural Gas serving the HVAC equipment, and plumbing serving the restrooms and catering space. The HVAC consisted of 12 packaged roof top units and radiant floor heating.





  • INDUSTRIAL + PROCESS

    • Ardent Ales Brewery Process Piping

      The Ardent Craft Ales facility was a design-assist project consisting of a 300 BBL beer brewing system and associated process piping. The equipment served includes a 15-barrel system, with an oversized, 20-barrel mash tun for higher gravity beers, a 15-barrel kettle, four 30-barrel fermenters and one 30-barrel bright tank.