The St. Edward-Epiphany School project was a design-build renovation of the HVAC system serving the school. Our scope of work consisted of a new VRF system, new outdoor air units, and substantial upgrades to the existing heating hot water system. The project which included 4,000 ft. of refrigerant pipe, and 1,500 ft. of heating water piping was completed in 45 working days. Just in time delivery, working in multiple phased areas concurrently, and other fast track strategies were utilized to complete this project on budget and in time for the faculty to move in to prepare for the school year.
Owner | ST. EDWARD-EPIPHANY SCHOOL |
Architect | 41,500 SQ. FT. |
Project size | KOP ARCHITECHTS |
engineer | ETEC MECHANICAL |